During Spring 2005 campus-wide network infrastructure will be installed
in the Math Sciences Building.
Here's the latest information on where the wiring team from Network
Installation Company will be working. This page will be updated as
information becomes available.
- Tue Mar 18: Preliminary work in east and west wiring closets of
floors 1-6.
- Wed Mar 19: Preliminary work in east and west wiring closets of
floors 1-6. Office wiring in the 5300 aisle.
- Thu Mar 20: Hallway and office wiring on floors 1, 2 and 3.
- Fri Mar 21: Continuing work on floors 1, 2 and 3. Some drilling
on the 5th floor at the border of the old and new
portions of the building.
- Mon Mar 24: University holiday. Work continues on floors
1, 2 and 3. Wiring work in library and graduate
cubicles on floor 5.
- Tue Mar 25: Wiring in both hallways and offices will take place
on floors 6 and 7.
- Wed Mar 26: Continuing work on floors 6 and 7.
- Thu Mar 27: Continuing work on floors 6 and 7.
- Fri Mar 28: Continuing work on floors 6 and 7.
- Mon Mar 31: Continuing work on floors 1 through 6
- Tue Apr 1: Continuing work on floors 1 through 6
- Wed Apr 2: Continuing work on floors 1 through 6
- Thu Apr 3: Continuing work on floors 1 through 6
- Fri Apr 4: Continuing work on floors 1 through 6
- Mon Apr 7: Continuing work on floors 1 through 6
- Tue Apr 8: Continuing work on floors 1 through 6
- Wed Apr 9: Continuing work on floors 1 through 6
- Thu Apr 10: Continuing work on floor 7
- Fri Apr 11: Continuing work on floor 7
Last update: Mar 25, 4:30 PM